Authorship, review and evidence boundary
- Technical review
- East Baoyu Engineering Editorial Team
- Reviewed
- 2026-09-05
- Scope
- General engineering and procurement guidance. This article is not a project-specific design, capacity statement, certificate, warranty, code interpretation or contract requirement.
Evidence basis: Official and public references identified in the article. Project values and release decisions require qualified review under the applicable project responsibilities.
Read the Editorial PolicyYes—an extracted screw pile may be a candidate for reuse, but removal does not make it automatically reusable. The original product identity, manufacturing and installation records, service exposure, extraction condition, remaining durability, receiving ground, new actions, connection details and approval route all matter. Some evidence can travel with the pile; other evidence resets when the site, structure or system configuration changes. The practical task is therefore not to label a stockpile “reusable.” It is to classify each identifiable pile, close the evidence gaps, and obtain project-specific engineering acceptance before assigning it a new foundation role.
Removal Is Only the First Gate
Screw piles are attractive for temporary or relocatable works partly because they can be installed and removed with relatively little permanent concrete work. Engineering New Zealand’s 2015 screw-pile Practice Note remains listed as guidance on design, certification, installation and testing, and its underlying context includes temporary use. That establishes a credible removability proposition; it does not approve an extracted component for a second structural application (Engineering New Zealand Practice Notes).
Designing for disassembly is also not the same as guaranteeing reuse. ISO 20887:2020, confirmed current in 2025, applies design-for-disassembly and adaptability principles to buildings, civil works and their constituent parts. The standard expressly does not set specific performance levels for disassembly or adaptability (ISO 20887:2020). A project can make a pile easier to recover by preserving access, compatible connections and records, yet the recovered item still needs a technically valid destination.
The first gate therefore asks: can the pile be extracted under a controlled plan? The next gates ask different questions:
- Can the individual pile and every critical component be identified?
- Is its relevant service and extraction history known?
- Does condition evidence support further assessment?
- Is the product/system compatible with the proposed head, extensions and connection?
- Can it meet the receiving project’s structural, geotechnical, durability and approval requirements?
“Removed intact” answers none of those questions by itself.
Separate Five Claims Hidden Inside “Reusable”
Teams often use one word for five different propositions. Separating them prevents a commercial or sustainability ambition from becoming an engineering conclusion.
| Claim | Minimum meaning | Evidence that may support it | What the claim still does not establish |
|---|---|---|---|
| Extractable | The pile can be removed under a planned operation | Access review, connection details, removal plan and extraction log | Identity, condition after extraction or suitability for another project |
| Identifiable | The recovered item can be tied to a defined product and history | Durable mark, piece ID, drawings, material records, purchase/installation records | Current integrity, remaining durability or new-site capacity |
| Inspectable | Relevant surfaces, geometry and connections can be examined by an approved scope | Cleaning/preservation record, dimensional survey, visual and specified examination results | That every degradation or damage mechanism has been detected |
| Technically suitable | The assessed item and system can satisfy defined receiving-project demands | Engineering assessment, compatible components, ground/design inputs and any required verification | Regulatory, contractual or owner acceptance unless those routes are closed |
| Accepted for reuse | The responsible parties have approved a stated application with limitations | Signed disposition, approved design basis, inspection/test records and controlled installation documents | Suitability outside that stated application or after another uncontrolled change |
This distinction also protects a useful circular-economy objective. A pile that does not qualify for a new structural foundation role may still have a controlled lower-consequence use or a recycling route. Calling every non-reused pile a failure encourages teams to skip the evidence work or overstate the outcome.
Run Every Pile Through a Requalification Chain
Foundation reuse guidance offers a helpful decision principle, even where its assets and projects differ. FHWA’s Foundation Reuse for Highway Bridges explains that existing foundations can have uncertain material properties, geometry and details, may be damaged, may lack sufficient capacity and may have limited remaining service life. It organizes the decision around integrity, durability and capacity, while warning that the report is a decision-making tool rather than a guideline (FHWA-HIF-18-055).
That report concerns bridge foundations that generally remain in place, not extracted screw piles. Applying its assessment categories here is an engineering inference. Extraction adds a new event to the chain, and a new site resets soil and interface assumptions.
Use the following lifecycle map to decide what survives and what must be rebuilt:
| Gate | Question | Evidence that can survive if traceable | Evidence that normally resets or needs fresh confirmation | Possible outcome |
|---|---|---|---|---|
| 1. Identity | What exactly is this pile and component set? | Manufacturer/product record, model, material, geometry, heat/batch link, coatings, weld and coupling records | Identity if marks and record links are lost | Quarantine unidentified items |
| 2. Original release | What was it qualified and released to do? | Approved drawings, design basis, certificates/evaluation documents, inspection and test records | Applicability when configuration, code basis or intended use changes | Preserve original envelope only |
| 3. Installation and service | What happened before removal? | Installation log, torque/depth history, deviations, load history, exposure, repairs and incidents | Unknown loading, corrosion environment or undocumented modification | Define investigation gap |
| 4. Extraction and condition | What happened during recovery? | Approved extraction record, orientation/force observations, photographs, component map, post-removal measurements and examinations | Pre-extraction condition cannot be reconstructed from a clean stockpile | Accept for assessment, repair route or reject |
| 5. Receiving project | What must it do now? | Only evidence shown to remain applicable | Actions, soil profile, installation response, buckling/restraint, lateral demand, durability, head/interface and approval basis | Project-specific requalification |
| 6. Controlled reinstallation | How will the approved item retain its status? | Assigned ID and accepted limitations | Installation evidence, deviations and final release at the new location | Release, hold or revised disposition |
The chain is intentionally asymmetric: a record may survive, but its applicability may not. An original material certificate can still describe the steel. The original installation torque cannot describe the new soil. A previous load test may remain useful background, but it cannot automatically establish capacity for a different pile, configuration, ground profile or loading regime.
Decide What Evidence Survived Extraction
Begin before removal, while records can still be reconciled with installed locations. Once piles enter an anonymous stockpile, a perfect-looking tube cannot restore identity or history.
Create a one-to-one map between the installed location, extracted item and post-removal ID. The evidence package should address four layers.
Original product and system identity. Record the shaft section, helix or flight geometry, lengths/extensions, couplings, head/bracket, material and coating system using approved product documents. Preserve manufacturer, model and evaluation-report details where they apply. Do not combine similar-looking extensions, couplings or heads merely because they fit physically.
First installation and service history. Retain installation equipment and procedure records required by the original project, depth and response history, refusal or obstruction events, deviations, approved repairs, load/testing records, service duration, environmental exposure, structural changes and known overload or impact incidents. An absent event is not evidence that it never occurred.
Extraction history. Define the responsible procedure and record relevant observations without turning the reuse assessment into a removal-method shortcut. Preserve component sequence, pile orientation, unusual resistance, local deformation, connection damage, coating disturbance and any cutting, heating, straightening or repair. Keep photographs tied to the individual ID.
Post-extraction condition. The appointed technical parties should define cleaning, dimensions, straightness, helix condition, connections, coating, corrosion, welds and any examination or testing needed for the actual risk. Visual examination is valuable but bounded. It cannot by itself establish material identity, internal condition, remaining thickness everywhere, prior loading or structural capacity.
Where evidence is missing, record the gap explicitly. Inspection may close some gaps; it cannot recreate every historical fact. The decision may therefore become more conservative even when the steel appears serviceable.
Requalify the Pile for the Receiving Project
The receiving project is not a continuation of the old design. It introduces a new structure, load path, soil profile, installation response, exposure, service life, connection and authority chain.
At minimum, the appointed engineers and approval parties need to reconcile:
- permanent, variable, uplift, compression, lateral, cyclic, accidental and temporary actions as applicable;
- current geotechnical information, variability, obstructions, groundwater, corrosion exposure and installation feasibility;
- shaft, helix, extension, coupling, head/bracket and structure-interface configuration;
- structural resistance, geotechnical resistance, deformation/serviceability and durability for the intended life;
- effects of the first installation, service, extraction, handling, storage and any approved repair;
- system compatibility and the status of product evaluations, certificates, instructions and project specifications;
- new installation controls, validation evidence, inspection points, deviations and final release authority.
ICC-ES AC358 provides a useful boundary for evaluated helical pile systems in its scope. It requires distinct system/device identification and product information covering materials, dimensions, tolerances and manufacturing processes. It also separates bracket, shaft, helix and soil capacities, with system capacity controlled by the applicable limiting element (ICC-ES AC358). AC358 is not a reuse procedure, and it does not authorize a recovered pile. It does show why a loose steel shaft, an unverified coupling and a new ground condition cannot inherit one undifferentiated “pile capacity.”
For receiving-site inputs, use the same discipline applied to a new foundation concept: begin with the Ground Screw Selection from Site Investigation and close every structure-to-foundation input before deciding whether old evidence remains relevant. If new installation-response or load-test evidence is required, its purpose, method and acceptance route must be defined for the new project rather than copied from the old one.
Try to Falsify Reuse With Three Scenarios
A good assessment tries to disprove an optimistic reuse case early. These scenarios show how the decision changes when one evidence link fails.
| Scenario | Evidence that survives | What the test tries to falsify | Calibrated route |
|---|---|---|---|
| Same temporary structure, same site, controlled relocation | Durable IDs, complete original dossier, mapped installation/service history, controlled extraction and acceptable condition evidence | The assumption that “same site” eliminates local ground variability, extraction effects or the need for reinstallation controls | A limited change review may be possible under the same engineering authority, with location-specific checks and controlled reinstallation |
| Complete records, different project and ground | Product identity, manufacturing dossier and condition evidence | The assumption that old capacity, durability or interface approval transfers with the steel | Treat the recovered pile as a controlled input to new-project structural, geotechnical, durability and approval work |
| Clean stockpile, weak identity and unknown history | Only observable geometry and condition that an approved examination can establish | The assumption that clean appearance recreates material identity, prior loading, exposure or extraction history | Reject or restrict structural reuse unless accountable parties can close the decisive gaps; retain recycling or separately engineered lower-consequence routes |
These are not pass/fail rules. They expose which proposition the available evidence cannot support. The disposition must still follow the governing project documents and responsible authorities.
Issue a Reuse Evidence Passport
Do not issue a stockpile-wide statement such as “60 reusable screw piles.” Issue an individual or controlled-batch passport with a disposition register. At minimum, include:
- unique recovered-item ID and chain from original installed location;
- manufacturer, product/model, component configuration and material/coating evidence;
- original project, design envelope, drawings, installation records and release status;
- service duration, exposure, modifications, repairs and known incidents;
- extraction date, method reference, contractor, observations and component map;
- post-extraction cleaning/preservation, measurements, examinations, results and limitations;
- photographs tied to identity and relevant features;
- receiving-project reference, proposed location, configuration, actions, ground and design-life inputs;
- evidence reused, evidence rejected and evidence newly required;
- compatibility review for shaft, extensions, couplings, head/bracket and installation equipment;
- engineering disposition: same-site reuse, new-site reuse, restricted use, repair/reassessment, recycling or disposal;
- conditions, open items, validity limits, approvals and revision history.
The passport is not a certificate created by editorial formatting. It is a controlled index to the evidence and decisions owned by the appointed parties. If several piles share a manufacturing batch, do not let the batch record erase individual extraction damage or location history. If an item changes after approval—through repair, component substitution, handling damage or a receiving-design revision—reopen the affected assessment.
For the wider comparison that first introduces removal and reuse, see Screw Piles vs Concrete Foundations. For product families and a bounded technical enquiry, use the Screw Piles page.
Related Resources
- Screw Piles — review product families and submit project-specific foundation inputs.
- Screw Piles vs Concrete Foundations — compare installation, programme, access and decommissioning boundaries.
- Ground Screw Selection from Site Investigation — turn receiving-site information into selection questions.
- Installation Torque and Ground Screw Capacity — understand why an installation number needs a defined, project-specific relationship to the decision.
- Plan a Ground Screw Load Test Program — define a test purpose, applicability and disposition route when new validation is required.
References
- ISO 20887:2020, Design for disassembly and adaptability — current international framework for disassembly/adaptability principles; it does not set product-specific reuse performance levels.
- Federal Highway Administration, Foundation Reuse for Highway Bridges — decision framework addressing integrity, durability and capacity for existing bridge foundations; used here as a bounded analogy, not a screw-pile reuse rule.
- Engineering New Zealand, Practice Note 28 listing — official listing and scope for 2015 screw-pile design, certification, installation and testing guidance.
- ICC Evaluation Service, AC358 — product/system identification, documentation and component-capacity framework for evaluated helical pile systems within its scope; not a recovered-pile approval method.
Next Step: Build the Passport Before Offering the Pile
Start the reuse decision before extraction, not after the stockpile has lost its history. Create a one-line register for every installed location and connect it to the product dossier, first installation, service/exposure record, extraction observations and post-removal condition evidence. Then add the receiving project’s actions, ground, interface, durability and approval inputs, marking clearly what evidence survives and what resets. Submit that bounded package through Screw Piles if East Baoyu needs to review product configuration and manufacturing-document inputs. The appointed structural, geotechnical, durability, installation, inspection, owner and approval authorities remain responsible for condition acceptance, design, capacity, construction safety and final reuse release.
References, disclosure and change record
References and further verification
- https://www.engineeringnz.org/engineer-tools/engineering-documents/practice-notes-and-guidelines/
- https://www.iso.org/standard/69370.html
- https://www.fhwa.dot.gov/publications/research/infrastructure/structures/18055/index.cfm
- https://icc-es.org/wp-content/uploads/acceptance-criteria/AC358.pdf
- https://eastbaoyu.com/ground-screw-selection-from-site-investigation/
- https://eastbaoyu.com/screw-piles-vs-concrete-foundations/
- https://eastbaoyu.com/screw-piles/
- https://eastbaoyu.com/installation-torque-and-ground-screw-capacity/
- https://eastbaoyu.com/plan-ground-screw-load-test-program/
Disclosure: East Baoyu manufactures and supplies products discussed on this website. Structured drafting tools may assist research and editing, but technical claims, project inputs and release decisions require qualified review under the applicable project responsibilities.