Xi’an Airport A380 Hangar is an East Baoyu and Baolai reference relevant to large-clear-span aircraft hangar steelwork. The case page explains the engineering priorities, fabrication workflow and information needed to plan a comparable project.

project airport
Case classification

What the public record supports

Scope under verification

Project identity and a group historical or capability association are published. The participating legal entity, contract tier, supply scope, quantities, dates and supporting records are not public.

Classification
Group historical reference
Location / year
Xi'an, China · Not public
Entity / role
Participating legal entity and contract role are not public.
Quantities / results
Customer, quantities and measured results are not public.
Record reviewed
2026-07-17

Disclosure limit: Use this page as an application or project-identity reference only until the participating entity, scope and supporting records are released.

How East Baoyu classifies and verifies evidence

Project Overview

Xi’an Airport A380 Hangar is an East Baoyu and Baolai reference relevant to large-clear-span aircraft hangar steelwork. The case page explains the engineering priorities, fabrication workflow and information needed to plan a comparable project.

Engineering Challenge

An A380 hangar requires very large clear spans, heavy primary members, precise connections and installation planning that controls temporary and permanent structural behaviour.

Fabrication and Delivery Approach

The fabrication route begins with design and connection review, followed by traceable material preparation, controlled welding, dimensional verification and trial checks for critical assemblies. Lifting, transport and delivery constraints are considered when dividing the structure into fabrication packages.

Project Value

The case is a reference for hangar projects where engineering coordination, heavy fabrication and erection planning must be developed together.

Information Needed for a Similar Project

  • Project location and applicable design standard
  • General arrangement, connection drawings and design loads
  • Material grade, coating system and inspection requirements
  • Quantity, delivery sequence, destination and target programme

Send the available drawings and specifications to the East Baoyu engineering team. We will identify any missing inputs and recommend a practical manufacturing and supply route.