What the public record supports
Project identity and a group historical or capability association are published. The participating legal entity, contract tier, supply scope, quantities, dates and supporting records are not public.
- Classification
- Group historical reference
- Location / year
- Xi'an, China · Not public
- Entity / role
- Participating legal entity and contract role are not public.
- Quantities / results
- Customer, quantities and measured results are not public.
- Record reviewed
- 2026-07-17
Disclosure limit: Use this page as an application or project-identity reference only until the participating entity, scope and supporting records are released.
How East Baoyu classifies and verifies evidenceProject Overview
Xi’an Airport A380 Hangar is an East Baoyu and Baolai reference relevant to large-clear-span aircraft hangar steelwork. The case page explains the engineering priorities, fabrication workflow and information needed to plan a comparable project.
Engineering Challenge
An A380 hangar requires very large clear spans, heavy primary members, precise connections and installation planning that controls temporary and permanent structural behaviour.
Fabrication and Delivery Approach
The fabrication route begins with design and connection review, followed by traceable material preparation, controlled welding, dimensional verification and trial checks for critical assemblies. Lifting, transport and delivery constraints are considered when dividing the structure into fabrication packages.
Project Value
The case is a reference for hangar projects where engineering coordination, heavy fabrication and erection planning must be developed together.
Information Needed for a Similar Project
- Project location and applicable design standard
- General arrangement, connection drawings and design loads
- Material grade, coating system and inspection requirements
- Quantity, delivery sequence, destination and target programme
Send the available drawings and specifications to the East Baoyu engineering team. We will identify any missing inputs and recommend a practical manufacturing and supply route.